Sketch a warehouse, estimate loading bays, check the power you need or calculate net yield on a purchase.

Space planner

Set the clear internal dimensions and split the footprint between your main activities.

Choose example zone shares
Clear internal dimensions
Share of the internal footprint
The remaining space is shown as circulation. Check access and safety clearances separately.
Arrange the layout
Select a zone and move it along the sketch. The loading edge marks a preference for discussion.

Left to right: Storage, working area, office and support, circulation.

Internal footprint 1,000 m²
40 m
25 m
Concept layout · Loading reference on the right edge
Storage
500 m²
Working area
200 m²
Office and support
100 m²
Circulation
200 m²

Use this sketch to brief a search; it is not an approved design. Check columns, doors, racking and fire routes against a measured plan before fit-out.

A saved plan stays in this browser on this device. RCIP only receives a plan you send in an enquiry.

Industrial yield calculator

See how the price, occupancy and costs affect a warehouse’s first-year net yield.

Enter your own transfer, legal and transaction allowances.
Use costs borne by the owner.
Base scenario net yield 6.36%
Total invested capital
AED 7,500,000
Occupancy-adjusted annual rent
AED 552,000
Net operating income
AED 477,000

Illustrative assumptions. This is a scenario from the entered figures, not a valuation, forecast or guaranteed return. The calculation excludes finance, tax and resale. Review the lease term and who pays for repairs before relying on these figures.

How the net yield is calculated

(Full-occupancy annual rent × occupancy − annual operating costs) ÷ (purchase price + acquisition costs + initial capital works) × 100. Finance, tax and resale are excluded.

Electricity load check

Compare a property’s approved connected load with the total load your operation needs. Start with the editable 80 to 150 kW example.

Use the approved load schedule. Leave blank if unknown. Use 0 if no existing load is confirmed.
Use the total required for the operation, including the equipment and fit-out in scope.
Compare connected load in kW for the same unit or site. A shared building with an unclear unit allocation needs a document check.
Additional connected load needed 70 kW

For applicable permanent connections, enter 80 kW in DEWA’s “Existing Load” field and 70 kW in “Proposed Load”.

Ask the landlord for the approved load schedule for the relevant connection and have a licensed consultant or contractor confirm the target and upgrade feasibility. Use DEWA’s calculator to estimate applicable connection charges.

Open DEWA’s official calculator