Industry guide
Data centre site selection in Dubai
Compare colocation, a powered shell and development land against the Dubai power and delivery brief.
Example. An international technology team needs its first phase of computing capacity in Dubai and plans to expand later. It is comparing managed colocation, a powered shell and a development site. Each option has a different path to the first power date.
Set a power requirement and date for each phase
Record opening and full-build IT load, the date power is needed for each phase and any estimate of total facility demand. Keep the utility’s quoted grid capacity and units separate. For a development site, ask the utility and project engineer to confirm the point of connection, works required and expected time to energise it.
Compare the property and procurement routes
For managed colocation, ask the operator to confirm committed capacity and dates by phase. For a powered shell, establish the power at handover, the fit-out scope and who pays for upgrades. For development land, confirm approved use, tenure and the route to building and energising the site.
Check fibre and cooling against the actual site
If the operating plan calls for fibre redundancy, ask for the carrier routes and building entrances so you can check whether the routes are physically separate. Confirm how the cooling system will reject heat and what utility capacity or water supply it requires. Have the relevant operator or engineer verify the evidence before relying on a site in your delivery schedule.
Areas to compare
- Dubai Silicon Oasis (DSO)
Investigate the operator’s development land route and assess plot-specific power, fibre, cooling and use.
- National Industries Park (NIP)
Compare the land and utility terms for a custom build if the authority confirms the intended use for a particular plot.
What to bring to RCIP
Record first-phase and full-build IT load separately from grid capacity. Check power dates, physically separate fibre paths and the cooling plan at the actual site.